Au service des professionnels et passionnés
Filtres
Innovative lighting system developed for motion picture, television, still photography, architectural lightning
Innovative lighting system developed for motion picture, television, still photography, architectural lightning and fine art display.
Ledzilla2, Daylight. Focusable onboard LED light. 6-18V DC input.
1 pièce (s) en stock
In-line dimmer - max. 1 kW @ 230 V - max. 750 W @ 120 V (90 - 260 V AC - European connector)
2 pièce (s) en stock
Dichroic graduated ND gray glass filter (two stops)
2 pièce (s) en stock
Holds a single glass gobo - Size A - ? 100 mm,Image max. ? 75 mm - weight: 100 g (3.5 oz.)
1 pièce (s) en stock
Mains power supply for DT3(-BI)-BAT (A / E / G / J / U. 100 - 240 V AC, please specify power connector)
1 pièce (s) en stock
Soft light head - 100W/150W tungsten . No Bulb. Dont let the small size and low wattage deceive you!
2 pièce (s) en stock
Eye filter attachment (fits DP400-185 only) . As long time users of Dedolight equipment know - our system never stops growing. These new filters are different from traditional diffusion filters.
2 pièce (s) en stock
This holder accepts the 30 cm (12) Dedoflex diffusers and reflectors and is mounted between the stand and the light head. Weight: 180 g (6.3 oz)
15 pièce (s) en stock
16mm receptacle (female) to hot-shoe mount adapter (female). Fits DLED2HSM and DLED2YHSM light heads.
1 pièce (s) en stock
Female shoe adapter to 1/4 male
6 pièce (s) en stock
Gel filter set - mixed diffusion (fits Classic Series filter holder)
1 pièce (s) en stock
Prevents stray light from exiting light head when no filter accessory is used. Weight: 19 g (0.6 oz.)
5 pièce (s) en stock
Transport case for LEDRAPTOR 7 kits with wheels
Délai de livraison de 4 à 6 semaines
Sony BPU Battery 14,4 V
Délai de livraison de 4 à 6 semaines
Control box for motorized sliding locks. 6 outputs. Incl. DLPS-12 power supply.
Délai de livraison de 4 à 6 semaines
Complete parallel beam light incl. 1200 W ballast, cable and lamp (( A / E / G / J / U ) 90 - 264 V AC, please specify AC power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
1200 W parallel beam light with parabolic reflector. 70 cm diameter. Requires DPOW1200D cable, DEB1200D ballast, special 1200 W G22 lamp
Délai de livraison de 4 à 6 semaines
Sundance' kit, 2 x 200D, 1 x 200S daylight, small soft box, hard case. (( A / E / G / J / U ) 90 - 264 V AC, please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Sundance' kit, 2 x DLH200D, 1 x DLH200SD daylight, medium soft box, soft case (( A / E / G / J / U ) 90 - 264 V AC, please specify power connector)
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 7 LED soft light, bicolor, DT40-BI power supply, DPOW20 cable (2x), Panaura 7 dome (Please specify power connector of "DCAB3A-SW" cable).
Délai de livraison de 4 à 6 semaines
4 Light DLED Kit - Bicolor (MASTER) - 4x DLED4-BI with 2x soft box, battery power supplies, batteries, DP1.1 and accessories. AC & DC (90-264 V AC, European cable), comes with DSCXLW soft case
Délai de livraison de 4 à 6 semaines
Dual-Charger for 2x DS-U95 batteries
Délai de livraison de 4 à 6 semaines
1200W focusing daylight Kit. Contains DLH1200D light head, DEB1200D ballast, cables, barn door and 2x 1200W lamps, single ended. Comes in two transport cases.
Délai de livraison de 4 à 6 semaines
DLHPA7x2D soft light head, 2x DEB400D ballasts, 2x light head cables, Panaura 7 dome, 2x 400/575W daylight lamps. (Please specify power connector of "DCAB3IEC" cable)
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 7 LED soft light, bicolor, DT40-BI power supply, 2x DPOW20 cable, Panaura 7 dome (Please specify power connector of "DCAB3A-SW" cable).
Délai de livraison de 4 à 6 semaines
4 Light DLED Kit - Daylight (MASTER) - 4x DLED4-D with 2x soft box, battery power supplies, batteries, DP1.1 and accessories. AC & DC (90-264 V AC, European cable), comes with DSCXLW soft case
Délai de livraison de 4 à 6 semaines
Hard case Kit with 3x DLED7 bicolor LED lights, soft boxes, DP1.1 and accessories.
Délai de livraison de 4 à 6 semaines
3 Light DLED Kit - Bicolor (MASTER) - 3x DLED4-BI with soft box, battery power supplies, batteries, DP1.1 and accessories.AC & DC (90-264 V AC, European cable), comes with DSC2/2-200 soft case
Délai de livraison de 4 à 6 semaines
4 Light Kit - Bicolor AC/DC (MASTER) - 2x DLED4-BI / 2x FELLONI BI50HO LED panel with soft box, battery power supplies, batteries, DP1.1 and accessories - AC & DC (90-264 V AC, European cable), comes with new soft case. Stand bag kit with 4x DST is included.
Délai de livraison de 4 à 6 semaines
4 Light DLED Kit - Bicolor (BASIC) - 4x DLED4-BI with 2x soft box, DP1.1 and accessories. AC only (90-264 V AC, European cable), comes with DSC2/2-200 soft case
Délai de livraison de 4 à 6 semaines
4 Light DLED Kit - Bicolor (STANDARD) - 4x DLED4-BI with soft box power supplies and accessories - AC (90-264 V AC, please specify power connector), comes with DCHDKA1 hard case
Délai de livraison de 4 à 6 semaines
DLH1200D light head for pole-operation, DEB1200D ballst, light head cable, light shield ring, barn door, 1200W daylight lamp (Please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, 8/16 bit switchable electronics, rainproof, bicolor, pole operated. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
DLH1200D light head, DEB1200D ballst, light head cable, light shield ring, barn door, 1200W daylight lamp (Please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Reflector Kit in Carry Bag
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, rainproof, bicolor, pole operated. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
DLH1x1200SD soft light head, DEB1200D ballast, light head cable, Panaura 7 dome, 1200W daylight lamp (Please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
4 Light Kit - Bicolor DC (BATTERY) - 2x DLED4-BI, 2x FELLONI BI50HO LED panel with soft box, battery power supplies, batteries, DP1.1 and accessories - DC only, comes with new soft case. Stand bag kit with 4x DST is included. European cable
Délai de livraison de 4 à 6 semaines
Soft case kit including 3x DLED3 focusing bicolor LED light heads, 2x soft boxes, DP1S imager, accessories and micro stands. Separate battery case (3x DS-U95B / 2x dual charger) included.
Délai de livraison de 4 à 6 semaines
Soft LED panel, pole operated, bicolor, 8/16 bit switchable electronics. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, 8/16 bit switchable electronics, rainproof, bicolor. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
Soft case kit including 3x DLED3 focusing bicolor LED light heads, 2x soft boxes, DP1S imager, accessories and micro stands. AC power supplies.
Délai de livraison de 4 à 6 semaines
4 Light Kit - Daylight AC/DC (MASTER) - 2x DLED4-D / 2x FELLONI D50HO LED panel with soft box, battery power supplies, batteries, DP1.1 and accessories, AC & DC (90-264 V AC, European cable), comes with new soft case. Stand bag kit with 4x DST is included.
Délai de livraison de 4 à 6 semaines
dedolight soft LED panel, Bicolor, incl. four removable corner pieces, diffuser panel and AC power cable (A / E / G / J / U. 90 - 264 V AC, please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, rainproof, bicolor. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
3 Light DLED Kit - Bicolor (STANDARD) - 3x DLED4-BI with soft box power supplies, DP1.1 and accessories - AC (90-264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
3 Light DLED Kit - Daylight (MASTER) - 3x DLED4-D with soft box, battery power supplies, batteries, DP1.1 and accessories. AC & DC (90-264 V AC, European cable), comes with DSC2/2-200 soft case
Délai de livraison de 4 à 6 semaines
New transport case for DLH652T light head models.Basic 3 x 650 W tungsten kit, hard case (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Soft case kit including 3x DLED3 focusing daylight LED light heads, 2x soft boxes, DP1S imager, accessories and micro stands. Separate battery case (3x DS-U95B / 2x dual charger) included.
Délai de livraison de 4 à 6 semaines
Soft LED panel, bicolor, 8/16 bit switchable electronics. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
4 Light Kit - Bicolor AC (BASIC) - 2x DLED4-BI, 2x FELLONI BI50HO LED panel with soft box, DP1.1 and accessories.AC only (90-264 V AC, European cable), comes with new soft case. Stand bag kit with 4x DST is included.
Délai de livraison de 4 à 6 semaines
Hard case Kit with 3x DLED7 daylight LED lights, soft boxes, DP1.1 and accessories
Délai de livraison de 4 à 6 semaines
Soft case kit including 3x DLED3 focusing daylight LED light heads, 2x soft boxes, DP1S imager, accessories and micro stands. AC power supplies.
Délai de livraison de 4 à 6 semaines
dedolight soft LED panel, Bicolor, incl. four removable corner pieces, diffuser panel and AC power cable (A / E / G / J / U. 90 - 264 V AC, please specify power connector of "DCAB3A-SW" or "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Reflector Kit in Hardcase (w/o wheels)
Délai de livraison de 4 à 6 semaines
4 Light Kit - Daylight DC (BATTERY) - 2x DLED4-D, 2x FELLONI D50HO LED panel with soft box, battery power supplies, batteries, DP1.1 and accessories - DC only, comes with new soft case. Stand bag kit with 4x DST is included. European cable
Délai de livraison de 4 à 6 semaines
3 Light DLED Kit - Bicolor (STANDARD) - 3x DLED4-BI with soft box, battery power supplies, batteries and accessories. AC & DC (90-264 V AC, European cable), comes with DSC2/2-200 soft case
Délai de livraison de 4 à 6 semaines
3 Light Kit - BICOLOR AC (STANDARD) - 2x DLED4-BI / 1x FELLONI BI50HO LED panel with soft box, DP1.1 and accessories - AC (90-264 V AC, European cable), comes with DCHDKA2 transport case
Délai de livraison de 4 à 6 semaines
4 Light DLED Kit - Daylight (BASIC) - 4x DLED4-D with 2x soft box, DP1.1 and accessories. AC only (90-264 V AC, European cable), comes with DSC2/2-200 soft case
Délai de livraison de 4 à 6 semaines
1 x 400/575 W daylight kit, hard case with handle and wheels (( A / E / G / J / U ) 90 - 264 V AC, please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Reflector Kit in Soft Case (with wheels)
Délai de livraison de 4 à 6 semaines
Standard 1 x 400/575 W daylight kit, hard case (( A / E / G / J / U ) 90 - 264 V AC, please specify power connector of "DCAB3IEC" cable)
Délai de livraison de 4 à 6 semaines
Reflector Kit in Hardcase (w/o wheels)
Délai de livraison de 4 à 6 semaines
3 Light Kit - BICOLOR AC (STANDARD) - 2x DLED4-BI / 1x FELLONI BI50HO LED panel with soft box, DP1.1 and accessories - AC (90-264 V AC, European cable), comes with DBPSW backpack with transport wheels
Délai de livraison de 4 à 6 semaines
3 Light Kit - Bicolor AC (STANDARD) - 2x DLED4-BI / 1x FELLONI BI50HO LED panel with soft box, DP1.1 and accessories - AC (90-264 V AC, European cable), comes with DBPSLED backpack
Délai de livraison de 4 à 6 semaines
4 Light DLED Kit - Daylight (STANDARD) - 4x DLED4-D with soft box power supplies and accessories - AC (90-264 V AC, please specify power connector), comes with DCHDKA1 hard case
Délai de livraison de 4 à 6 semaines
100x100cm Lightstream reflector with two surfaces, motorized control. Spread index 2 and 3
Délai de livraison de 4 à 6 semaines
1 x 400/575 W daylight kit, soft case. (( A / E / G / J / U ) 90 - 264 V AC, please specify power connector of "DCAB3IEC" cable)
Délai de livraison de 4 à 6 semaines
Reflector Kit in Soft Case (with wheels)
Délai de livraison de 4 à 6 semaines
Four DLHM4300 light heads with integrated - dimmable - electronic transformers work with 24 V / 150 W lamps and more (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
3 Light DLED Kit - Bicolor (BASIC) - 3x DLED4-BI with soft box and accessories. AC only (90-264 V AC, European cable), comes with DSC1/1-200 soft case
Délai de livraison de 4 à 6 semaines
4 Light Kit - Daylight AC (BASIC) - 2x DLED4-D, 2x FELLONI D50HO LED panel with soft box, DP1.1 and accessories.AC only (90-264 V AC, European cable), comes with new soft case. Stand bag kit with 4x DST is included.
Délai de livraison de 4 à 6 semaines
Soft case kit including 3x DLED3 focusing bicolor LED light heads, 2x soft boxes, DP1S imager, accessories and micro stands. AC & DC power supplies.
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 5 LED soft light, bicolor, DT20-BI power supply, DPOW20 cable, Panaura 5 dome (Please specify power connector of "DCAB3A-SW" cable).
Délai de livraison de 4 à 6 semaines
Dedolight Dedocool Standard 2-Light Kit. Concentrated Light in a Small Fixture - Dimmable - Max 500W - Reduced Heat Fixtures - Multi-Voltage.
Délai de livraison de 4 à 6 semaines
3 Light DLED Battery Kit - Bicolor (BATTERY) - 3x DLED4-BI with soft box, battery power supplies, batteries and accessories. DC only, comes with DSC1/1-200 soft case. European cable
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, 8/16 bit switchable electronics, rainproof, daylight, pole operated. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
3 Light DLED Kit - Daylight (STANDARD) - 3x DLED4-D with soft box power supplies, DP1.1 and accessories - AC (90-264 V AC, please specify power connector)
Délai de livraison de 4 à 6 semaines
Standard 1 x 400/575 W daylight kit, hard case. (( A / E / G / J / U ) 90 - 264 V AC, please specify power connector of "DCAB3IEC" cable)
Délai de livraison de 4 à 6 semaines
3 Light Kit - DAYLIGHT AC (STANDARD) - 2x DLED4-D/ 1x FELLONI D50HO LED panel with soft box, DP1.1 and accessories - AC (90-264 V AC, European cable), comes with DCHDKA2 transport case
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, rainproof, daylight, pole operated. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
3 Light Kit - BICOLOR AC (BASIC) - 2x DLED4-BI, 1x FELLONI BI50HO LED panel with soft box and accessories AC only (90-264 V AC, European cable), comes with DBPSW backpack with transport wheels
Délai de livraison de 4 à 6 semaines
3 Light Kit - Bicolor AC (BASIC) - 2x DLED4-BI, 1x FELLONI BI50HO LED panel with soft box and accessories AC only (90-264 V AC, European cable), comes with DBPSLED backpack
Délai de livraison de 4 à 6 semaines
Soft case kit including 3x DLED3 focusing bicolor LED light heads, 2x soft boxes, accessories and micro stands.
Délai de livraison de 4 à 6 semaines
DLH400SD soft light head, DEB400D ballast, light head cable, Panaura 5 dome, 400/575W daylight lamp. (Please specify power connector of "DCAB3IEC" cable)
Délai de livraison de 4 à 6 semaines
Soft case kit including 3x DLED3 focusing daylight LED light heads, 2x soft boxes, DP1S imager, accessories and micro stands. AC & DC power supplies.
Délai de livraison de 4 à 6 semaines
Master 4 x 24 V / 150 W (DLH4) tungsten kit - 4 x DT24-1 (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Multicolor LED panel
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, pole operated, daylight, 8/16 bit switchable electronics. (A / E / G / J / U. 90 - 264 V AC).
Délai de livraison de 4 à 6 semaines
3 Light Kit - DAYLIGHT AC (STANDARD) - 2x DLED4-D/ 1x FELLONI D50HO LED panel with soft box, DP1.1 and accessories - AC (90-264 V AC, European cable), comes with DBPSW backpack with transport wheels
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 7 LED soft light, 4x LED with 1000W bicolor, with speedring for Panaura 7 dome.
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, 8/16 bit switchable electronics, rainproof, daylight. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
100x100cm Lightstream reflector with two surfaces, motorized control. Spread index 1 and 4
Délai de livraison de 4 à 6 semaines
3 Light Kit - Daylight AC (STANDARD) - 2x DLED4-D/ 1x FELLONI D50HO LED panel with soft box, DP1.1 and accessories - AC (90-264 V AC, European cable), comes with DBPSLED backpack
Délai de livraison de 4 à 6 semaines
Ledzilla Table-Top Kit, bicolor, BASIC version
Délai de livraison de 4 à 6 semaines
3 Light Micro Kit - Bicolor AC/DC - 3x DLED2-BI LED panels, soft box, batteries, DP1S and accessories, comes with DSCS soft case (with extra belt clips to combine DSCS with SDSTM3 stand kit)
Délai de livraison de 4 à 6 semaines
4-Light multispectrum kit with 4 lights and accessories
Délai de livraison de 4 à 6 semaines
3 Light DLED Kit - Daylight (STANDARD) - 3x DLED4-D with soft box, battery power supplies, batteries and accessories. AC & DC (90-264 V AC, European cable), comes with DSC2/2-200 soft case
Délai de livraison de 4 à 6 semaines
Four DLH4 light heads work with dimmable - in-line - electronic DIMTA3 power supplies and 12 V / 100 W DL100 lamps.
Délai de livraison de 4 à 6 semaines
Master 3 x 24 V / 150 W (DLH4) tungsten kit - 3 x DT24-1 (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
dedolight soft LED panel, Daylight, incl. four removable corner pieces, diffuser panel and AC power cable (A / E / G / J / U. 90 - 264 V AC, please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, rainproof, daylight. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
Ledzilla Table-Top Kit, daylight, BASIC version
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 5 LED soft light, bicolor, DT20-BI power supply, DPOW20 cable, Panaura 5 dome, DLRAP5-P pouch,(Please specify power connector of "DCAB3A-SW" cable).
Délai de livraison de 4 à 6 semaines
DLH400SD soft light head, DEB400D ballast, light head cable, medium soft box, 400/575W daylight lamp. (Please specify power connector of "DCAB3IEC" cable)
Délai de livraison de 4 à 6 semaines
3 Light Micro Kit - Daylight AC/DC - 3x DLED2-D LED panels, soft box, batteries, DP1S and accessories, comes with DSCS soft case (with extra belt clips to combine DSCS with SDSTM3 stand kit)
Délai de livraison de 4 à 6 semaines
Dedolight soft LED panel, daylight, 8/16 bit switchable electronics. (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable required. Please specify power connector of "DCAB3A" (optional: "DCAB3A-SW") cable)
Délai de livraison de 4 à 6 semaines
Soft case kit including 3x DLED3 focusing daylight LED light heads, 2x soft boxes, accessories and micro stands.
Délai de livraison de 4 à 6 semaines
Basic 4 x 24 V / 150 W (DLH4) tungsten kit - 4 x DT24-1 (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Master 'Compact' kit, 2 x 24 V / 150 W (DLH4/DLHM4-300E), 1 x DLH1000S-E, 1 x DT24-1E (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
dedolight soft LED panel, Daylight, incl. four removable corner pieces, diffuser panel and AC power cable(A / E / G / J / U. 90 - 264 V AC, please specify power connector of "DCAB3A-SW" or "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Sundance' kit, 1 x 200D daylight, hard case. (( A / E / G / J / U ) 100 - 255 V AC, please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
300 W focusing LED light head, daylight with separate DMX power supply, barn door and AC power cable (A / E / G / J / U. 90 - 264 V AC / please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
3 Light DLED Battery Kit - Daylight (BATTERY) - 3x DLED4-D with soft box, battery power supplies, batteries and accessories.DC only, comes with DSC1/1-200 soft case. European cable
Délai de livraison de 4 à 6 semaines
3 Light Kit - Daylight AC/DC (MASTER) - 2x DLED4-D / 1x Z-180 LED panel with soft box, battery power supplies, batteries and accessories, AC & DC (90-264 V AC, European cable), comes with DSC1/1-200 soft case
Délai de livraison de 4 à 6 semaines
3 Light Kit - DAYLIGHT AC (BASIC) - 2x DLED4-D, 1x FELLONI D50HO LED panel with soft box and accessories AC only (90-264 V AC, European cable), comes with DBPSW backpack with transport wheels
Délai de livraison de 4 à 6 semaines
3 Light DLED Kit - Daylight (BASIC) - 3x DLED4-D with soft box and accessories, AC only (90-264 V AC, European cable), comes with DSC1/1-200 soft case
Délai de livraison de 4 à 6 semaines
Four DLHM4300 light heads with integrated - dimmable - electronic transformers work with 24 V / 150 W lamps. (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
3 Light Kit - Daylight AC (BASIC) - 2x DLED4-D, 1x FELLONI D50HO LED panel with soft box and accessories AC only (90-264 V AC, European cable), comes with DBPSLED backpack
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 3 LED soft light, 2x 220W bicolor, with speedring for Panaura 5 dome, stand and transport soft case (Please specify power connector of "DCAB3A-SW" cable).
Délai de livraison de 4 à 6 semaines
Flicker-free electronic ballast, 1200 W, for high speed shootings, incl. AC power cable (A / E / G / J / U. 90 - 264 V AC, please specify power connector of "DCAB3A" cable )
Délai de livraison de 4 à 6 semaines
Soft case kit with DLED10-BI bicolor, cable, ballast, ballast holder, light shield ring and barn door. (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
300 W focusing LED light head, daylight with separate DMX power supply, barn door and AC power cable (A / E / G / J / U. 90 - 264 V AC / please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
3 Light Kit - Bicolor DC (BATTERY) - 2x DLED4-BI / 1x Z-180S LED panel with battery power supplies, batteries and accessories - DC only, comes with DSC1/1-200 soft case
Délai de livraison de 4 à 6 semaines
DLED12 Studio LED light head, bicolor, for pole-operation and DMX control, barn door (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 3 LED soft light, 2x 220W bicolor, with speedring for Panaura 3 dome, stand and transport soft case (Please specify power connector of "DCAB3A-SW" cable).
Délai de livraison de 4 à 6 semaines
4 Light head Aspherics - 4 Dimmable electronic power supply - 4 Barn door - 4 Stands - 1 Wallholder - 1 Clamp - 6 Halogen lamp 12V 100W - 1 Plastic box and Transport hard case.
Délai de livraison de 4 à 6 semaines
Flicker-free electronic ballast 1200 W - incl. DMX control - incl. mains cable (90 - 260 V AC - please specify power plug)
Délai de livraison de 4 à 6 semaines
DLH200D light head, DEB200D ballast, light head cable, light shield ring, barn door, 200W daylight lamp. (Please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Reflector Kit in Maxi Carry Bag
Délai de livraison de 4 à 6 semaines
DLH200SD soft light head, DEB200D ballast, light head cable, Panaura 3 dome, 200W daylight lamp. (Please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Battery pack NiMh 28,8V/ 28Ah (806,4 W/h) + 13V simultan
Délai de livraison de 4 à 6 semaines
1 Light DLED9 Kit - BICOLOR - 1x DLED9-BI with AC & DC power supplies and accessories. Comes in DSCQ1 soft case. AC & DC (90-264 V AC, European cable
Délai de livraison de 4 à 6 semaines
3 Light Kit - Bicolor AC (BASIC) - 2x DLED4-BI, 1x Z-180S LED panel, power supplies and accessories. AC only (90-264 V AC, European cable), comes with DSC1/1-200 soft case
Délai de livraison de 4 à 6 semaines
Focusing LED light head, bicolor incl. DMX power supply and AC power cable, pole operated (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable needed (please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
3 Light head Aspherics - 3 Dimmable electronic power - 3 Barn door - 3 Stand - 1 Wallholder - 1 Clamp - 6 Halogen lamp 24V 150W - 1 Plastic Box and Transport hard case. (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLED12 Studio LED light head, bicolor, with DMX control, barn door (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
Soft case kit with DLED10-D daylight, cable, ballast, ballast holder, light shield ring and barn door. (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
Basic 'Compact' kit, 2 x 24 V / 150 W (DLH4/DLHM4-300E), 1 x DLH1000S-E, 1 x DT24-1E (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLH200SD soft light head, DEB200D ballast, light head cable, medium soft box, 200W daylight lamp. (Please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
DLED10 LED light head, bicolor, DT10-BI power supply, light shield ring, barn door and AC power cable (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
Light head 1200 W Daylight, pole operated
Délai de livraison de 4 à 6 semaines
DLH200SD soft light head, DEB200D ballast, light head cable, small soft box, 200W daylight lamp. (Please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 3 LED soft light, bicolor, DT10-BI power supply, DPOW10 cable, Panaura 5 dome, DLRAP5-P pouch, (Please specify power connector of "DCAB3A-SW" cable).
Délai de livraison de 4 à 6 semaines
DLED12 Studio LED light head, tungsten, for pole-operation and DMX control, barn door (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
DLED12 Studio LED light head, daylight, for pole-operation and DMX control, barn door (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 3 LED soft light, bicolor, DT10-BI power supply, DPOW10 cable, Panaura 3 dome, DLRAP3-P pouch, (Please specify power connector of "DCAB3A-SW" cable).
Délai de livraison de 4 à 6 semaines
Focusing LED light head, bicolor incl. DMX power supply and AC power cable (A / E / G / J / U. 90 - 264 V AC). Separate mains power cable needed (please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Motorized yoke for 650 Watt light head, separate DMX control box incl. PSU. 650 Watt light head not included (DLH652T / DLH652T-DMX)
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Motorized yoke for 650 Watt light head, separate DMX control box incl. PSU. 650 Watt light head not included (DLH650 / DLH650-DMX).
Délai de livraison de 4 à 6 semaines
1000W focusing tungsten kit. Contains DLH1000T light head, barn door and 2x 1000W lamps, single ended. European cable
Délai de livraison de 4 à 6 semaines
3 Light Kit - Daylight DC (BATTERY) - 2x DLED4-D / 1x Z-180 LED panel with battery power supplies, batteries and accessories - DC only, comes with DSC1/1-200 soft case
Délai de livraison de 4 à 6 semaines
DLHPA7x2T soft light head, Panaura 7 dome, 2x 1000W tungsten lamps. European cable
Délai de livraison de 4 à 6 semaines
Light head 800/1200 W Daylight
Délai de livraison de 4 à 6 semaines
DLH1000T light head for pole-operation and DMX control, light shield ring, barn door, 1000W G22 tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
Imager projection attachment Kit with DP1.1 and DP2.1, several lenses and accessories, hard case
Délai de livraison de 4 à 6 semaines
Focusing LED light head, tungsten incl. DMX power supply and AC power cable, pole operated (A / E / G / J / U. 90 - 264 V AC, please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Daylight incl. DMX power supply and AC power cable, pole operated (A / E / G / J / U. 90 - 264 V AC, please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
DLED10 LED light head, daylight, DT10 power supply, light shield ring, barn door and AC power cable (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
Complete wide-angle imager with iris module and 70mm projection lens. Fits SERIES 1200 and DLED12 / DLED30 focusing light heads.
Délai de livraison de 4 à 6 semaines
Complete wide-angle imager with universal module and 70mm projection lens. Fits SERIES 1200 and DLED12 focusing light heads
Délai de livraison de 4 à 6 semaines
Power supply with built-in DMX control for DLRAP7 LED soft light. (A / E / G / J / U. 90 - 264 V AC). 2x DPOW20 cable required.Mains power cable included (please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
DLED12 Studio LED light head, daylight, with DMX control, barn door (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
DLED12 Studio LED light head, tungsten, with DMX control, barn door (Please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
3 Light Kit - Daylight AC (BASIC) - 2x DLED4-D, 1x Z-180 LED panel with soft box, power supplies and accessories. AC only (90-264 V AC, European cable), comes with DSC1/1-200 soft case
Délai de livraison de 4 à 6 semaines
Flicker-free electronic ballast, 400/575 W, incl. AC power cable (A / E / G / J / U. 90 - 264 V AC, please specify power connector of "DCAB3IEC" cable )
Délai de livraison de 4 à 6 semaines
300 W focusing LED light head pole-operated, daylight. DPOW30 cable and DT30 power supply required
Délai de livraison de 4 à 6 semaines
DLED9 LED light head, bicolor, DT9-BI-BAT-AB power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, bicolor incl. DMX power supply with digital display for Kelvin values, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
1 Light DLED Kit - Bicolor (Master) - 1x DLED4-BI with soft box, battery power supply, battery and accessories DC only, comes with DSCM soft case. European cable.
Délai de livraison de 4 à 6 semaines
1 Light DLED9 Kit - DAYLIGHT - 1x DLED9-D with AC & DC power supplies and accessories. Comes in DSCQ1 soft case. AC & DC (90-264 V AC, European cable
Délai de livraison de 4 à 6 semaines
DLED7N-C Light head neo color, DTN7C+ Power Supply, DPOWN7C-3 Cable 3m, DLPS15-100 AC-DC Power Supply, DPLS Light shield ring, DBD8 Standard barn door
Délai de livraison de 4 à 6 semaines
Light head 1000 W tungsten - build in DMX control - pole operated (100 - 240 V AC - please specify power plug)
Délai de livraison de 4 à 6 semaines
DLED7N-BI Light head neo bicolor, DTN+ Power Supply with BT/CRMX, DPOWN Cable 1.3m, DLPS15-100 AC-DC Power Supply, DPLS Light shield ring, DBD8 Standard barn door
Délai de livraison de 4 à 6 semaines
Soft bag kit with 7 reflectors in 50x50 cm size. Kit consists out of: reflector #1 (2x), #2 (2x), #3, #4, #5. Five locking devices and five flexible stand extensions.
Délai de livraison de 4 à 6 semaines
DLH1000T light head with DMX control, light shield ring, barn door, 1000W G22 tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Bicolor incl. DMX power supply incl. Kelvin Display, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, bicolor incl. power supply, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Complete wide-angle imager with framing-shutter-blade module and 70mm projection lens. Fits SERIES 1200 and DLED12 focusing light heads
Délai de livraison de 4 à 6 semaines
Focusing 80W ultra-violet LED light head, 365-400nm tunable, for max. contrast ration. UV radiation! Wear eye and skin protection.
Délai de livraison de 4 à 6 semaines
DLED9 LED light head, bicolor, DT9-BI power supply, light shield ring, barn door, Australian cable
Délai de livraison de 4 à 6 semaines
DLED9 LED light head, bicolor, DT9-BI power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Focusing 80W infrared LED light head, 860-960nm tunable, for max. contrast ratio
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Daylight incl. DMX power supply and AC power cable (A / E / G / J / U. 90 - 264 V AC, please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head, tungsten incl. DMX power supply and AC power cable (A / E / G / J / U. 90 - 264 V AC, please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
DLED7N-C Light head neo color, DTN7C+ Power Supply, DPOWN7C-3 Cable 3m, DPLS Light shield ring, DBD8 Standard barn door
Délai de livraison de 4 à 6 semaines
DLH1000T light head for pole-operation, light shield ring, barn door, 1000W G22 tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
FOCUSING 80W INFRARED LED LIGHT HEAD
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Bicolor incl. power supply, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLH4x150S soft light head, DT4x150 power supply, Panaura 5 dome, high temperature resistant pouch, 4x 150W tungsten lamps. (Please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 5 LED soft light, 2x LED with 500W bicolor, with speedring for Panaura 5 dome.
Délai de livraison de 4 à 6 semaines
1 Light DLED Kit - Bicolor (BASIC) - 1x DLED4-BI with battery power supply, battery and accessories DC only, comes with DSCM soft case. European cable. (old code: SLED1-BI-E)
Délai de livraison de 4 à 6 semaines
DLED7N-BI Light head neo bicolor, DTN+ Power Supply with BT/CRMX, DPOWN Cable 1.3m, DPLS Light shield ring, DBD8 Standard barn door
Délai de livraison de 4 à 6 semaines
DLED7N-BI Light head neo bicolor, DTN Power Supply, DPOWN Cable 1.3m, DLPS15-100 AC-DC Power Supply, DPLS Light shield ring, DBD8 Standard barn door
Délai de livraison de 4 à 6 semaines
Imager wide-angle projection attachment, complete with iris assembly and 100mm lens
Délai de livraison de 4 à 6 semaines
Soft light head for two lamps 400/575 W daylight, incl. UV protection glass
Délai de livraison de 4 à 6 semaines
Reflector Kit in Softcase (w/o wheels)
Délai de livraison de 4 à 6 semaines
Imager wide-angle projection attachment, complete with universal receptacle assembly and 100mm lens
Délai de livraison de 4 à 6 semaines
300 W focusing LED light head, daylight. DPOW30 cable and DT30 power supply required.
Délai de livraison de 4 à 6 semaines
DLED7 Turbo LED light head, bicolor, DT7-BI-BAT-AB power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request.Focusing LED light head, tungsten incl. 8/16 Bit switchable DMX power supply, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request.Focusing LED light head, Daylight incl. 8/16 Bit switchable DMX power supply, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Standard 650 W tungsten Kit, hard case (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Light head 1000 W tungsten - build in DMX control (100 - 240 V AC - please specify power plug)
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, bicolor incl. DMX power supply with digital display for Kelvin values, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLED7N-BI Light head neo bicolor, DTN Power Supply, DPOWN Cable 1.3m, DPLS Light shield ring, DBD8 Standard barn door
Délai de livraison de 4 à 6 semaines
Focusing LED light head, bicolor
Délai de livraison de 4 à 6 semaines
DLED9 ultra-violet LED light head, 400nm, DT9 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
DLED9 ultra-violet LED light head, 365nm, DT9 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Focusing LED light head, tungsten incl. DMX power supply, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Daylight incl. DMX power supply, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLED7 Focusing 90W TURBO LED light head, bicolor incl. DMX power supply with digital display for Kelvin values, studio edition (90 - 264 V AC, Eutrac adapter with DMX signal) all Black
Délai de livraison de 4 à 6 semaines
DLED7 Turbo LED light head, bicolor, DT7-BI power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Light head 1000 W tungsten - pole operated (100 - 240 V AC - please specify power plug)
Délai de livraison de 4 à 6 semaines
1 Light DLED Kit - Daylight (Master) - 1x DLED4-D with soft box, battery power supply, battery and accessoriesDC only, comes with DSCM soft case. European cable.
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Bicolor incl. DMX power supply with digital display for Kelvin values, studio edition(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head - Bicolor. Studio edition. Complete with power supply. 90-264 VAC - PRICE ON REQUEST
Délai de livraison de 4 à 6 semaines
DLH1000T light head, light shield ring, barn door, 1000W G22 tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, bicolor incl. power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Focusing LED light head, Bicolor incl. DMX power supply incl. Kelvin Display, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Transport hard case (DLH652T/DLH652T-DMX)
Délai de livraison de 4 à 6 semaines
Imager wide-angle projection attachment, complete with framing shutter assembly and 100mm lens
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, tungsten incl. DMX power supply, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, daylight incl. DMX power supply, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
1 x 650 W tungsten kit, soft case (( A / E / G / J / U ) 90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Imager projection attachment kit (DP400 with iris assembly), hard case
Délai de livraison de 4 à 6 semaines
DLH4x150S soft light head, DT4x150 power supply, medium silver dome, high temperature resistant pouch, 4x 150W tungsten lamps. (Please specify power connector of "DCAB3A" cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head, tungsten incl. power supply, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Daylight incl. power supply, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLH652T light head for pole-operation and DMX control, light shield ring, barn door, 650W tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
Soft bag kit with 5 reflectors in 50x50 cm size. Kit consists out of: reflector #1, #2, #3, #4, #5, one of each. Four locking devices and four flexible stand extensions.
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Focusing LED light head, Bicolor incl. power supply, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Imager projection attachment kit (universal receptacle assembly) - hard case
Délai de livraison de 4 à 6 semaines
Battery pack NiMH w/ internal charge. The BIGPACK will power up to four classic 12 V Dedolights in conjunction with the Dedolight splitter box (DLSPLIT) and may also be used to power the Series 200 lights. Includes internal overnight charger.
Délai de livraison de 4 à 6 semaines
DLED7 ultra-violet LED light head, 365nm, DT7 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Soft light head for one lamp 1200 W daylight, incl. UV protection glass. Fits Panaura 7 soft box (DLPA7)
Délai de livraison de 4 à 6 semaines
Light head, 400/575 W daylight
Délai de livraison de 4 à 6 semaines
Lightstream Lite Kit with 13 reflectors and accessories
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head tungsten incl. power supply, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head daylight incl. power supply, studio edition, pole-operated (90 - 264 VAC, European cable)
Délai de livraison de 4 à 6 semaines
Flicker-free electronic ballast - 200 W (90 - 260 V AC - please specify power plug)
Délai de livraison de 4 à 6 semaines
1 Light DLED Kit - Daylight (BASIC) - 1x DLED4-D with with battery power supply, battery and accessories DC only, comes with DSCM soft case. European cable.(old code: SLED1-D-E)
Délai de livraison de 4 à 6 semaines
Complete imager with iris module and 150mm projection lens. Fits SERIES 1200 and DLED12 / DLED30 focusing light heads.
Délai de livraison de 4 à 6 semaines
Soft light head for two lamps 1000 watts - tungsten - with 3 m (9.8 ) cable (100 - 240 V AC - please specify power plug)
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request.Focusing LED light head, Daylight incl. 8/16 Bit switchable DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request.Focusing LED light head, tungsten incl. 8/16 Bit switchable DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLED4 LED light head, bicolor, DT4-BI-BAT-AB power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
Light head 1000 W tungsten (100 - 240 V AC - please specify power plug)
Délai de livraison de 4 à 6 semaines
DLED9 LED light head, tungsten, DT9-BAT power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
DLED9 LED light head, daylight, DT9-BAT-AB power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Bicolor
Délai de livraison de 4 à 6 semaines
Focusing 90W LED light head neo, bicolor
Délai de livraison de 4 à 6 semaines
New light head model, 650 W tungsten, DMX-control, pole operated, with 5 m (16.5') AC power cable(A / E / G / J / U. 100 - 240 V AC, please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head, tungsten incl. DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Daylight incl. DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLED9 LED light head, tungsten, DT9 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
DLED9 LED light head, daylight, DT9 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Complete imager with universal module and 150mm projection lens. Fits SERIES 1200 and DLED12 focusing light heads.
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request.Focusing LED light head, tungsten incl. 8/16 Bit switchable DMX power supply, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Imager projection lens - 230 mm - f 2.0
Délai de livraison de 4 à 6 semaines
DLED4 ultra-violet LED light head, 400nm, DT4 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
DLED4 ultra-violet LED light head, 365nm, DT4 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Soft bag kit with 7 reflectors in 25x25 cm size. Kit consists out of: reflector #1 (2x), #2 (2x), #3, #4, #5. Five locking devices and five flexible stand extensions.
Délai de livraison de 4 à 6 semaines
DLED4 LED light head, bicolor, DT4-BI power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Separate 1000 W option: In addition to SPS5 kit - 1 x DLH1000S-E soft light complete with soft box silver medium and extra blue diffusers for Daylight conversion, soft case (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
The first light designed expressly to meet the special require-ments of ultra high speed film making and videography.
Délai de livraison de 4 à 6 semaines
Imager projection attachment kit (framing shutter assembly) - hard case
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Focusing LED light head, Daylight incl. 8/16 Bit switchable DMX power supply, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Focusing LED light head, tungsten incl. DMX power supply, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLH652T light head with DMX control, light shield ring, barn door, 650W tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Bicolor incl. DMX power supply with digital display for Kelvin values, studio edition(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Focusing LED light head, Daylight incl. DMX power supply, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Light head, 200 W daylight
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, daylight incl. DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, tungsten incl. DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head tungsten incl. power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head Daylight incl. power supply, studio edition (90 - 264 VAC, European cable)
Délai de livraison de 4 à 6 semaines
DLED9 special LED light head - UV 400 nm wavelength technology, "black-light" - slightly UV-A radiation
Délai de livraison de 4 à 6 semaines
DLED9 special LED light head - UV 365 nm wavelength technology, "black-light" - slightly UV-A radiation
Délai de livraison de 4 à 6 semaines
Ceiling light 60x60cm, daylight LED
Délai de livraison de 4 à 6 semaines
DLED9 LED light head, tungsten, DT9-BAT power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
Soft bag kit with 7 reflectors in 12x15 cm size. Kit consists out of: reflector #1 (2x), #2 (2x), #3, #4, #5. Five locking devices and five flexible stand extensions.
Délai de livraison de 4 à 6 semaines
LEDRAPTOR 3 LED soft light, 250W bicolor, with speedring for Panaura 3 dome.
Délai de livraison de 4 à 6 semaines
DLED7 Turbo LED light head, tungsten, DT7-BAT-AB power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
DLED7 Turbo LED light head, daylight, DT7-BAT-AB power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
DLH652T light head for pole-operation, light shield ring, barn door, 650W tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
DLH1000SPLUS soft light head, Panaura 5 dome, high temperature resistant pouch, 1000W tungsten lamp. European cable
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Focusing LED light head, tungsten incl. power supply, studio edition, pole-operated(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, bicolor
Délai de livraison de 4 à 6 semaines
DLED3 Turbo LED light head (camera shoe), bicolor, DT3-BI-BAT, barn door
Délai de livraison de 4 à 6 semaines
Complete imager with framing-shutter-blade module and 150mm projection lens. Fits SERIES 1200 and DLED12 focusing light heads.
Délai de livraison de 4 à 6 semaines
Power supply with built-in DMX control for DLRAP5 LED soft light. (A / E / G / J / U. 90 - 264 V AC). DPOW20 cable required. Mains power cable included (please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
DLED3 Turbo LED light head, bicolor, DT3-BI-BAT, barn door
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Bicolor incl. power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLED7 Turbo LED light head, tungsten, DT7 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
DLED7 Turbo LED light head, daylight, DT7 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Focusing LED light head Black, bicolor incl. DMX power supply with digital display for Kelvin values, Eutrac Adapter
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Focusing LED light head, Daylight incl. power supply, studio edition, pole-operated (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLED4 infrared LED light head, 860nm, DT4 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head daylight incl. power supply, studio edition (90 - 264 VAC, European cable)
Délai de livraison de 4 à 6 semaines
New light head model, 650 W tungsten, DMX-control, with 5 m (16.5') AC power cable(A / E / G / J / U. 100 - 240 V AC, please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head tungsten incl. power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Imager projection attachment, complete with iris assembly and 185mm lens
Délai de livraison de 4 à 6 semaines
Focusable IR-A LED light, adjustable between 860nm and 960nm wavelength. DT4-BI or DT4-BI-BAT required
Délai de livraison de 4 à 6 semaines
DP1.1 kit with imager accessories, extra 50mm lens and transport case
Délai de livraison de 4 à 6 semaines
DLED7 ultra-violet LED light head, 365nm, UV- radiation! wear eye & skin protection
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head neo, bicolor
Délai de livraison de 4 à 6 semaines
Senior' soft kit, 1 x 1000 W (DLH1000S-E), (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Power supply with built-in DMX control for DLED30-D. (A / E / G / J / U. 90 - 264 V AC). DPOW30 cable required. Mains power cable included (please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
Power supply with built-in DMX control for DLED10-D. (A / E / G / J / U. 90 - 264 V AC). DPOW10 cable required. Mains power cable included (please specify connector of "DCAB3A-SW" power cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head, daylight
Délai de livraison de 4 à 6 semaines
Focusing 80W infrared LED light head, 860nm, for cameras with night-shot function
Délai de livraison de 4 à 6 semaines
70 mm - f 1.5 - high transmission - six element - projection lens. High resolution with low distortion.Weight: 1130 g (2.5 lb.)
Délai de livraison de 4 à 6 semaines
Soft bag kit with 5 reflectors in 25x25 cm size. Kit consists out of: reflector #1, #2, #3, #4, #5, one of each. Four locking devices and four flexible stand extensions.
Délai de livraison de 4 à 6 semaines
DLED3 Turbo LED light head (camera shoe), tungsten, DT3-BAT, barn door
Délai de livraison de 4 à 6 semaines
DLED3 Turbo LED light head (camera shoe), daylight, DT3-BAT, barn door
Délai de livraison de 4 à 6 semaines
Mono' soft kit, 1 x 24 V / 150 W (DLHM4-300E) tungsten with DP1.1 imager (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
The DP400 projection attachment is a modular system enabling quick change and versatility.Model universal.
Délai de livraison de 4 à 6 semaines
New light head model, 650 W tungsten, pole operated, with 5 m (16.5') AC power cable(A / E / G / J / U. 100 - 240 V AC, please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
DLED4 LED light head, tungsten, DT4-BAT-AB power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
DLED3 Turbo LED light head, daylight, DT3-BAT, barn door
Délai de livraison de 4 à 6 semaines
DLED3 Turbo LED light head, tungsten, DT3-BAT, barn door
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Focusing LED light head, tungsten incl. 8/16 Bit switchable DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLED2 LED light head (shoe mount), bicolor, DT2-BI-BAT power supply, 140cm light head cable, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
DLED2 LED light head, bicolor, DT2-BI-BAT power supply, 140cm light head cable, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
dedolight PanAura 7 textile reflector
Délai de livraison de 4 à 6 semaines
DLED4 special LED light head - UV 365 nm wavelength technology, "black-light" - slightly UV-A radiation
Délai de livraison de 4 à 6 semaines
DLED4 special LED light head - UV 400 nm wavelength technology, "black-light" - slightly UV-A radiation
Délai de livraison de 4 à 6 semaines
DLED4 LED light head, daylight, DT4-BAT-AB power supply, light shield ring, barn door
Délai de livraison de 4 à 6 semaines
Its AC power input can be set for every AC power in the world from 110 V to 240 V in 6 steps.
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request. Focusing LED light head, Daylight incl. 8/16 Bit switchable DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Soft light head - 400/575 W Daylight/tungsten
Délai de livraison de 4 à 6 semaines
DLED4 LED light head, tungsten, DT4 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
DLED7 80W ultra-violet LED light head, 400nm, UV- radiation! wear eye & skin protection
Délai de livraison de 4 à 6 semaines
Power Supply dedolight for light head neo color
Délai de livraison de 4 à 6 semaines
Focusing LED light head, tungsten incl. DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Soft bag kit with 5 reflectors in 12x15 cm size. Kit consists out of: reflector #1, #2, #3, #4, #5, one of each. Four locking devices and four flexible stand extensions.
Délai de livraison de 4 à 6 semaines
Soft case kit EFLECT LARGE - with all four reflector surfaces
Délai de livraison de 4 à 6 semaines
DLH652T light head, light shield ring, barn door, 650W tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
Transport hard case (DLH1200D/DLH1000T)
Délai de livraison de 4 à 6 semaines
EFLECT extra large reflector multi-mirror, zebra (tropical orange/blue , wide stripes), small grid. Dovetail rail (for DLR-LOCK-M) on the back. Size 80 x 80 cm (31.5 x 31.5")
Délai de livraison de 4 à 6 semaines
DLED4 LED light head, daylight, DT4 power supply, light shield ring, barn door, European cable
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Daylight incl. DMX power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLED2 LED light head, (shoe mount), daylight, DT2-BAT power supply, 140cm light head cable, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
DLED2 infrared LED light head, 860nm, DT2-BAT power supply, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
DLED2 infrared LED light head, 960nm, DT2-BAT power supply, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
DLED2 LED light head, daylight, DT2-BAT power supply, 140cm light head cable, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
100 mm - f 1.6 - high transmission - six elements - projection lens. High resolution with low distortion. Weight: 1130 g (2.5 lb.)
Délai de livraison de 4 à 6 semaines
Fluoreszilla, ultraviolet LED light head (black-light)
Délai de livraison de 4 à 6 semaines
Dedolight focusable royal blue / light blue LED light, adjustable between 450nm and 470nm wavelength
Délai de livraison de 4 à 6 semaines
DLH1000SPLUS soft light head, medium silver dome, high temperature resistant pouch, 1000W tungsten lamp. European cable
Délai de livraison de 4 à 6 semaines
Soft bag kit with 7 reflectors in 7x10 cm size. Kit consists out of: reflector #1 (2x), #2 (2x), #3, #4, #5. Five locking devices and five flexible stand extensions.
Délai de livraison de 4 à 6 semaines
Focusing 90W LED light head neo, tungsten
Délai de livraison de 4 à 6 semaines
Focusing 90W LED light head neo, daylight
Délai de livraison de 4 à 6 semaines
DLED2 LED light head with electronics (shoe mount), bicolor, NPF battery holder, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
DLED2 LED light head with electronics, bicolor, NPF battery holder, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
Focusing LED light head, tungsten
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Daylight
Délai de livraison de 4 à 6 semaines
EFLECT extra large reflector multi-mirror, zebra (silver/gold , wide stripes), small grid. Dovetail rail (for DLR-LOCK-M) on the back. Size 80 x 80 cm (31.5 x 31.5")
Délai de livraison de 4 à 6 semaines
EFLECT extra large reflector multi-mirror, zebra (silver/gold, wide stripes), large grid. Dovetail rail (for DLR-LOCK-M) on the back. Size 80 x 80 cm (31.5 x 31.5")
Délai de livraison de 4 à 6 semaines
Focusing LED light head - Bicolor (requires power supply)
Délai de livraison de 4 à 6 semaines
Focusing 40W LED light head neo, bicolor
Délai de livraison de 4 à 6 semaines
DLH1000S soft light head, medium silver dome, high temperature resistant pouch, 1000W tungsten lamp. European cable
Délai de livraison de 4 à 6 semaines
Transport hard case (KLED2x1F Kits)
Délai de livraison de 4 à 6 semaines
DP2.1 kit with DPEYE filters, extra 50mm lens and transport case
Délai de livraison de 4 à 6 semaines
Focusing 90W Turbo LED light head neo color, RGBACL
Délai de livraison de 4 à 6 semaines
DLH1x150S soft light head, DT24-1 power supply, medium silver dome, high temperature resistant pouch, 150W tungsten lamp. European cable
Délai de livraison de 4 à 6 semaines
Imager projection attachment - complete with framing shutter assembly
Délai de livraison de 4 à 6 semaines
Focusing LED light head, tungsten incl. power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Ledzilla focusable onboard blue / cyan LED light, adjustable between 470nm and 505nm wavelength with flip-down short pass filter. 6-18V DC input.
Délai de livraison de 4 à 6 semaines
Power supply with built-in DMX control for DLED10-BI.(A / E / G / J / U. 90 - 264 V AC). DPOW10 cable required. Mains power cable included (please specify connector of DCAB3A-SW power cable)
Délai de livraison de 4 à 6 semaines
Transport hard case (K200-3)
Délai de livraison de 4 à 6 semaines
Power Supply dedolight neo with BT/CRMX
Délai de livraison de 4 à 6 semaines
Ledzilla bicolor light head with asymmetric framing-shutter imager DPOB2A
Délai de livraison de 4 à 6 semaines
Transport case (no wheels) for Lightstream reflectors
Délai de livraison de 4 à 6 semaines
DLED2 LED light head with electronics (shoe mount), daylight, NPF battery holder, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
Baby' soft kit, 1 x 24 V / 150 W (DLH1x150S), 1 x DT24-1E (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Fluoreszilla, LED light head with 365nm wavelength technology, "black-light" (6 - 18 V DC) - slightly UV-A radiation
Délai de livraison de 4 à 6 semaines
Wide angle condenser Series 1200 for use with lenses 70 mm - 100 mm or 150 mm
Délai de livraison de 4 à 6 semaines
Ledzilla bicolor light head with asymmetric universal imager DPOB1A
Délai de livraison de 4 à 6 semaines
DLED2 LED light head with electronics, daylight, NPF battery holder, barn door, DLPS12-30 power supply
Délai de livraison de 4 à 6 semaines
Transport hard case for Lightstream reflectors
Délai de livraison de 4 à 6 semaines
Transport hard case (2x COOLH / COOLT3)
Délai de livraison de 4 à 6 semaines
DLHM4-300 light head, light shield ring, barn door, 150W tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
Focusing LED light head, Daylight incl. power supply, studio edition (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Power supply / control unit for DLH4x150S (230 V AC, European cable). Note! DLH4x150S, DT4x150, DPOW4x150-2 and DPOW4x150-8 => NEW SPEACON connectors instead of AMPHENOL 4x150 W soft light models, bought before January 2011 are NOT compatible with new connectors!
Délai de livraison de 4 à 6 semaines
Mono' soft kit, 1 x 24 V / 150 W (DLH4) tungsten (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Soft case for Panaura 7 kits with wheels
Délai de livraison de 4 à 6 semaines
Fluoreszilla, LED light head with 400nm wavelength technology, "black-light" (6 - 18 V DC) - slightly UV-A radiation
Délai de livraison de 4 à 6 semaines
New light head model, 650 W tungsten with 5 m (16.5') AC power cable(A / E / G / J / U. 100 - 240 V AC, please specify power connector of "DCAB3A-SW" cable)
Délai de livraison de 4 à 6 semaines
DLH1x150S soft light head, DT24-1 power supply, small silver dome, high temperature resistant pouch, 150W tungsten lamp. European cable
Délai de livraison de 4 à 6 semaines
IR version of DLED4.1. 860nm (requires power supply)
Délai de livraison de 4 à 6 semaines
Soft bag kit with 4 reflectors in 12x15 cm size. Kit consists out of: reflector #1, #2, #3, #4, one of each. Three locking devices and three flexible stand extensions.
Délai de livraison de 4 à 6 semaines
Focusing 20W LED Bicolor light head with shoe mount for video cameras and built in electronics
Délai de livraison de 4 à 6 semaines
Focusing 20W LED Bicolor light head with 16mm (5/8") receptacle and built in electronics
Délai de livraison de 4 à 6 semaines
iREDZILLA, infrared LED light head
Délai de livraison de 4 à 6 semaines
Dedolight LedZilla Focusable onboard BLUE/BLUE LED Light adjustable between 450nm and 470nm wavelength
Délai de livraison de 4 à 6 semaines
Ledzilla focusable onboard green/amber LED light, adjustable between 520nm and 600nm wavelength. 6-18V DC input.
Délai de livraison de 4 à 6 semaines
Ledzilla focusable onboard blue/green LED light, adjustable between 450nm and 520nm wavelength. 6-18V DC input.
Délai de livraison de 4 à 6 semaines
Mono' soft kit, 1 x 24 V / 150 W (DLHM4-300E) tungsten (230 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Transport hard case with handle and wheels (DLH400DT, DEB400DT)
Délai de livraison de 4 à 6 semaines
iREDZILLA. Infrared LED light head - 960 nm (6-18 VDC) for surveillance cameras
Délai de livraison de 4 à 6 semaines
iREDZILLA. Infrared LED light head - 860 nm (6-18 VDC) for video cameras
Délai de livraison de 4 à 6 semaines
Soft LED panel, bicolor, pocket size, 6-18 V. No power option included. Options: NPF battery, camera battery cable, AC power supply DLPS12-30
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, tungsten
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head, daylight
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head neo, tungsten
Délai de livraison de 4 à 6 semaines
Focusing 90W TURBO LED light head neo, daylight
Délai de livraison de 4 à 6 semaines
Light head - 24 V / 150 W tungsten - with built-in transformer - DMX control and 3 m (9.8 ) European cable.
Délai de livraison de 4 à 6 semaines
Transport hard case with handle and wheels (KLT7-3 kits)
Délai de livraison de 4 à 6 semaines
Ledzilla daylight light head with asymmetric framing-shutter imager DPOB2A
Délai de livraison de 4 à 6 semaines
Soft light head, 200 W daylight
Délai de livraison de 4 à 6 semaines
Soft bag kit with 5 reflectors in 7x10 cm size. Kit consists out of: reflector #1, #2, #3, #4, #5, one of each. Four locking devices and four flexible stand extensions.
Délai de livraison de 4 à 6 semaines
Ledzilla daylight light head with asymmetric universal imager DPOB1A
Délai de livraison de 4 à 6 semaines
DLH1x150S soft light head, DT24-1 power supply, mini dome, high temperature resistant pouch, 150W tungsten lamp. European cable
Délai de livraison de 4 à 6 semaines
EFLECT extra large reflector multi-mirror, tropical orange, small grid. Dovetail rail (for DLR-LOCK-M) on the back. Size 80 x 80 cm (31.5 x 31.5")
Délai de livraison de 4 à 6 semaines
EFLECT extra large reflector multi-mirror, tropical blue, small grid. Dovetail rail (for DLR-LOCK-M) on the back. Size 80 x 80 cm (31.5 x 31.5")
Délai de livraison de 4 à 6 semaines
Focusing 20W LED Daylight light head with shoe mount for video cameras and built in electronics
Délai de livraison de 4 à 6 semaines
High impact - polyethylene molded case. Will hold all equipment supplied with KA1 lighting kits. Weight: 5.3 kg (11.7 lb.) Size: 57 x 43 x 22 cm (22.5 x 17 x 8.75)
Délai de livraison de 4 à 6 semaines
High impact - polyethylene molded case. Will hold all equipment supplied with KAC and KA1 lighting kits. Weight: 5.3 kg (11.7 lb.) Size: 57 x 43 x 22 cm (22.5 x 17 x 8.75)
Délai de livraison de 4 à 6 semaines
Transport hard case (DLH402D, DEB400D)
Délai de livraison de 4 à 6 semaines
Transport hard case (DEB1200)
Délai de livraison de 4 à 6 semaines
Slide and gobo projection imager with forced air cooling and adjustable image plane.
Délai de livraison de 4 à 6 semaines
Condenser Series 1200 for use with lenses 150 mm - 185 mm or 230 mm
Délai de livraison de 4 à 6 semaines
Focusing 20W LED Daylight light head with 16mm (5/8") receptacle and built-in electronics
Délai de livraison de 4 à 6 semaines
Power Supply dedolight neo
Délai de livraison de 4 à 6 semaines
1 DLH4 Light head Aspherics? 1 DIMTA3 Dimmable electronic power supply 230 VAC 1 DBD8 Barn door 1 DFH Filter holder 2 DL100 Halogen lamp 12 V / 100 W 1 DSCM Soft case Weight: 2.0 kg (4.3 lb.) Size: 28 x 17 x 25 cm (11 x 6.7 x 10 inch)
Délai de livraison de 4 à 6 semaines
DLH4 light head, DT24-1 power supply, light shield ring, barn door, 150W tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
EFLECT extra large reflector multi-mirror, silver, small grid. Dovetail rail (for DLR-LOCK-M) on the back. Size 80 x 80 cm (31.5 x 31.5")
Délai de livraison de 4 à 6 semaines
EFLECT extra large reflector multi-mirror, gold, small grid. Dovetail rail (for DLR-LOCK-M) on the back. Size 80 x 80 cm (31.5 x 31.5")
Délai de livraison de 4 à 6 semaines
Power supply with DMX control and digital display for Kelvin values for DLED3-BI TURBO LED bicolor light heads. (100 - 240 V AC, European Cable)
Délai de livraison de 4 à 6 semaines
DLHM4-300 light head, light shield ring, barn door, 150W tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
EFLECT extra large reflector multi-mirror, gold, large grid. Dovetail rail (for DLR-LOCK-M) on the back. Size 80 x 80 cm (31.5 x 31.5")
Délai de livraison de 4 à 6 semaines
EFLECT extra large reflector multi-mirror, silver, large grid. Dovetail rail (for DLR-LOCK-M) on the back. Size 80 x 80 cm (31.5 x 31.5")
Délai de livraison de 4 à 6 semaines
Focusing 40W TURBO LED light head, bicolor, with camera shoe
Délai de livraison de 4 à 6 semaines
Lightstream Table-Top hard case
Délai de livraison de 4 à 6 semaines
Focusing 40W TURBO LED light head, bicolor
Délai de livraison de 4 à 6 semaines
Power supply with DMX control and digital display for Kelvin values for DLED7-BI TURBO light heads (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Soft case kit EFLECT LARGE - Mirror surfaces #1, gold and silver
Délai de livraison de 4 à 6 semaines
Focusing 40W TURBO LED light head neo, bicolor
Délai de livraison de 4 à 6 semaines
Soft case kit EFLECT LARGE - Mirror surfaces #2, gold and silver
Délai de livraison de 4 à 6 semaines
Soft case, medium with transport wheels
Délai de livraison de 4 à 6 semaines
Transport hard case (K200-1)
Délai de livraison de 4 à 6 semaines
Additional equipment to upgrade an SLL5-20 kit to a SLL13Q kit
Délai de livraison de 4 à 6 semaines
High impact - polyethylene molded case for DP400 imager in standard configurations and additional space for accessories. Weight: 4.2 kg (9.3 lb.) Size: 46.5 x 35 x 25 cm (18.3 x 13.8 x 10 inch)
Délai de livraison de 4 à 6 semaines
dedolight PanAura/Octodome 5 - fits: DLH400SDT - DLH1000SPLUS - DLH4x150S
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request.Power supply with 8/16 Bit switchable DMX control for DLED9-D / -T (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Power supply with DMX control and digital display for Kelvin values for DLED9-BI (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing 40W LED light head neo, tungsten
Délai de livraison de 4 à 6 semaines
Focusing LED light head, tungsten
Délai de livraison de 4 à 6 semaines
Same as DP3 but w/o lens incl. 24 V DC power supply and set of adapter plugs
Délai de livraison de 4 à 6 semaines
Dedolight extraLarge soft case with dividers and wheels. Will hold inchinterviewer inch kit and extra equipment. Weight: 5.8 kg (12.8 lb.) Size: 90 x 27 x 36 cm (35.4 x 10.6 x 13.4 inch)
Délai de livraison de 4 à 6 semaines
Focusing 20W LED Bicolor light head with yoke and shoe mount. Separate DT2.1-BI-BAT electronics required
Délai de livraison de 4 à 6 semaines
Focusing 40W TURBO LED light head, tungsten, with camera shoe
Délai de livraison de 4 à 6 semaines
Focusing 40W TURBO LED light head, daylight, with camera shoe
Délai de livraison de 4 à 6 semaines
Soft box for (medium) LEDRAMA LED panels
Délai de livraison de 4 à 6 semaines
Focusing 20W LED Bicolor light head with yoke and 16mm (5/8") receptacle. Separate DT2.1-BI-BAT electronics required
Délai de livraison de 4 à 6 semaines
Focusing 20W LED light head neo, bicolor
Délai de livraison de 4 à 6 semaines
Focusing 40W TURBO LED light head, daylight
Délai de livraison de 4 à 6 semaines
Focusing 40W TURBO LED light head, tungsten
Délai de livraison de 4 à 6 semaines
Focusing 40W TURBO LED light head neo, tungsten
Délai de livraison de 4 à 6 semaines
Focusing 40W TURBO LED light head neo, daylight
Délai de livraison de 4 à 6 semaines
Focusing 20W LED Daylight light head with yoke and shoe mount. Separate DT2.1-BAT electronics required
Délai de livraison de 4 à 6 semaines
Light head - 24 V / 150 W tungsten - built-in transformer - external dimmable and 4 m (13.1 ) European cable
Délai de livraison de 4 à 6 semaines
The self contained Dedolight DLHM4300 works with an integrated electronic power supply combining. European cable.
Délai de livraison de 4 à 6 semaines
Power supply with DMX control for DLED7-D / -T TURBO light heads (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing 20W LED light head neo, daylight
Délai de livraison de 4 à 6 semaines
DLED2 special LED light head with yoke - infrared 960 nm for surveilance cameras.
Délai de livraison de 4 à 6 semaines
DLED2 special LED light head with yoke - infrared 860 nm for cameras with night-shot mode.
Délai de livraison de 4 à 6 semaines
Focusing 20W LED Daylight light head with yoke and 16mm (5/8") receptacle. Separate DT2.1-BAT electronics required
Délai de livraison de 4 à 6 semaines
Wide angle condenser Series 400 for use with lens 70, 100 or 150 mm
Délai de livraison de 4 à 6 semaines
Backpack, small, with transport wheels for Felloni panel
Délai de livraison de 4 à 6 semaines
Power supply with DMX control and digital display for Kelvin values for DLED4-BI (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Soft bag kit, including 3x DSTM stands and 2x DSTFX40 flexible stand extensions. This stand kit completes all the SLEDM-Kits.
Délai de livraison de 4 à 6 semaines
Soft case for PanAura 5 kits
Délai de livraison de 4 à 6 semaines
Ledzilla bicolor light head with large intensifier. No honeycomb
Délai de livraison de 4 à 6 semaines
DC electronics for DLED9-BI light heads. Input 11 - 36V DC. 4-pin D-TAP connector.
Délai de livraison de 4 à 6 semaines
Special version, built on order only. Delivery times on request.Power supply with 8/16 Bit switchable DMX control for DLED4-D / -T(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
DLH4 light head, DIMTA3 power supply, light shield ring, barn door, 150W tungsten lamp, European cable
Délai de livraison de 4 à 6 semaines
Power supply with DMX control for DLED9-D / -T (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
Focusing LED light head - Daylight (requires power supply)
Délai de livraison de 4 à 6 semaines
Asymmetric universal projection attachment/imager for DLED2 and DLED3 LED light heads. Incl. DPL60M lens.
Délai de livraison de 4 à 6 semaines
Gobo rotator with built in fan for gel printed gobos size A - incl. 3 - 12 V DC power supply and set of adapter plugs
Délai de livraison de 4 à 6 semaines
Focusing 40W LED light head neo, daylight
Délai de livraison de 4 à 6 semaines
Asymmetric projection attachment with built-in framing shutter blades for DLED2 and DLED3 LED light heads. Incl. DPL60M lens.
Délai de livraison de 4 à 6 semaines
Asymmetric framing-shutter DP2 imager for Ledzilla with 60mm lens
Délai de livraison de 4 à 6 semaines
DC dimmable ballast for DLED7-BI TURBO LED light heads to use with batteries. Input 11 - 36V DC. D-TAP connector.
Délai de livraison de 4 à 6 semaines
Heavy duty transport case for 4-Light Multi-Spectrum kit
Délai de livraison de 4 à 6 semaines
The DLH1000SPLUS is a 1000 W halogen soft light similar to the DLH1000S but fitted with aLarger mounting yoke which allows the use ofLarger soft boxes. European cable
Délai de livraison de 4 à 6 semaines
Light head - 12 V / 100 W tungsten - with built-in transformer and 4 m (13.1 ) cable (230 V AC)
Délai de livraison de 4 à 6 semaines
Asymmetric universal imager DP1 for Ledzilla and 60mm lens
Délai de livraison de 4 à 6 semaines
Ledzilla bicolor light head DP2 and 60mm projection lens
Délai de livraison de 4 à 6 semaines
Backpack
Délai de livraison de 4 à 6 semaines
Power supply with digital display for Kelvin values for DLED7-BI TURBO light heads (90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
High temperature shields for Pan Aura 7 soft box. Set of 8
Délai de livraison de 4 à 6 semaines
Wide angle attachment with rotating barn door leaves for Series 1200
Délai de livraison de 4 à 6 semaines
Ledzilla bicolor light head including DP1 and 60mm projection lens
Délai de livraison de 4 à 6 semaines
Power supply with digital display for Kelvin values for DLED9-BI(90 - 264 V AC, European cable)
Délai de livraison de 4 à 6 semaines
dedolight PanAura/Octodome 3 - compact - for 8 hole DLH200SDT only
Délai de livraison de 4 à 6 semaines
Tripple stud boom with sliding receptacle. Length 42 cm.
Délai de livraison de 4 à 6 semaines
Backpack - small
Délai de livraison de 4 à 6 semaines
Backpack, small, with dividers for Felloni panel
Délai de livraison de 4 à 6 semaines
Power supply for DLED4.1-D / T with DMX (90 - 264 VAC)
Délai de livraison de 4 à 6 semaines
High temperature shields for PanAura 5 soft box. Set of 8
Délai de livraison de 4 à 6 semaines
Ledzilla bicolor, focusable onboard LED light with flip-down POL filter. 6-18V DC input.
Délai de livraison de 4 à 6 semaines
Ledzilla Bicolor with 16:9 filter and two barn door leaves attached. Separate battery shoe or mains power supply DLPS-12 required.
Délai de livraison de 4 à 6 semaines
Ledzilla LED light head (Bi-Color) (6-18 VDC)
Délai de livraison de 4 à 6 semaines
A dedicated single function halogen soft light - exclusively for use with many styles and sizes of soft boxes. European cable
Délai de livraison de 4 à 6 semaines
Similar to DP400SH but with image plane adjustment (any direction) to maintain sharp focus for off axis projections up to approx. 45° (depends on focal length of lens) Weight: 580 g (1.3 lb.)
Délai de livraison de 4 à 6 semaines
Wide angle attachment with rotating barn door leaves for Series 400
Délai de livraison de 4 à 6 semaines